In case of low voltage and heavy load, the relay loadability may replace the thermal loadability, leading to undesirable relay operation and cascading events.
低压重载系统中,保护载荷度可能取代热载荷度,导致保护不合理动作以及后续连锁过程。
Of course, there is still many problems needed to be solved, but it is believed that the online transmission line loadability estimation will face a good prospect.
This paper demonstrates the use of line stability index termed as fast voltage stability index (FVSI) in order to determine the bus maximum loadability in a power system.